Ganzlin Solar Park is a solar farm in Germany with a capacity of 64 MW, commissioned in 2020. It is operating and is owned by Clenergy.
In 2024 it settled 49.4 GWh of electricity, a load factor of 8.8%. That volume was settled under EEG support.
Its EEG support runs to the end of 2040, after which that output is sold at market prices.
This asset produced at 8.8% of nameplate in 2024 — the 35th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against gem.wiki; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets