Alt Daber 3 solar farm is a solar farm in Germany with a capacity of 4.2 MW, commissioned in 2019. It is operating and is owned by ENERPARC Solar Invest 26 GmbH.
In 2024 it settled 3.1 GWh of electricity, a load factor of 8.5%. It sold essentially all of that volume outside EEG support — it is already merchant.
This asset produced at 8.5% of nameplate in 2024 — the 16th percentile of German solar commissioned 2015-2019 (635 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE959856900937); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets