Balder A03 solar farm is a solar farm in Germany with a capacity of 5.3 MW, commissioned in 2020. It is operating and is owned by Balder A03 GmbH & Co. KG.
In 2024 it settled 4.7 GWh of electricity, a load factor of 10.2%. That volume was settled under EEG support.
This asset produced at 10.2% of nameplate in 2024 — the 60th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE926665307257); commissioning date and grid connection from EEG-Anlagenstammdaten. All Germany assets