Solar farm

Brandis 4 EP Leulitz 2 solar farm

Brandis 4 EP Leulitz 2 solar farm is a solar farm in Germany with a capacity of 3.7 MW, commissioned in 2011. It is operating.

In 2024 it settled 3.9 GWh of electricity, a load factor of 12.0%. That volume was settled under EEG support.

Capacity
3.7 MW
Country
Germany
Status
operating
Commissioned
2011
Owner
Technology
PV
Measured output 2024
3.9 GWh
Load factor
12.0%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap