Solar farm

Freifläche Magdeburg 2 MW solar farm

Freifläche Magdeburg 2 MW solar farm is a solar farm in Germany with a capacity of 2 MW, commissioned in 2011. It is operating and is owned by Solarpark Magdeburg Dietz KG.

In 2024 it settled 855 MWh of electricity, a load factor of 4.9%. That volume was settled under EEG support.

Its EEG support runs to the end of 2031, after which that output is sold at market prices.

Measured performance vs peers
4.9%
This assetCohort median 10.5%Middle half

This asset produced at 4.9% of nameplate in 2024 — the 2nd percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
2 MW
Country
Germany
Status
operating
Commissioned
2011
Owner
Solarpark Magdeburg Dietz KG
Technology
PV
Measured output 2024
855 MWh
Load factor
4.9%
EEG support ends
2031
Peer percentile
2nd
Grid connection
MS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE988028671757); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets