Solar farm

Freiflächenanlage Hettenleidelheim solar farm

Freiflächenanlage Hettenleidelheim solar farm is a solar farm in Germany with a capacity of 1.4 MW, commissioned in 2006. It is operating and is owned by Strukturentwicklungsgesellschaft für den Landkreis Bad Dürkheim mbH.

In 2024 it settled 1.3 GWh of electricity, a load factor of 10.8%. That volume was settled under EEG support.

Its EEG support runs to the end of 2026, after which that output is sold at market prices.

Measured performance vs peers
10.8%
This assetCohort median 10.4%Middle half

This asset produced at 10.8% of nameplate in 2024 — the 57th percentile of German solar commissioned pre-2010 (418 assets with metered output).

Capacity
1.4 MW
Country
Germany
Status
operating
Commissioned
2006
Owner
Strukturentwicklungsgesellschaft für den Landkreis Bad Dürkheim mbH
Technology
PV
Measured output 2024
1.3 GWh
Load factor
10.8%
EEG support ends
2026
Peer percentile
57th
Grid connection
MS
State
Rheinland-Pfalz

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE964804627958); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets