Friedland Datze 2a (Kleinbahn) solar farm is a solar farm in Germany with a capacity of 3.8 MW, commissioned in 2012. It is operating and is owned by ST Solarinvestitionsgesellschaft Mecklenburg 2 mbH.
In 2024 it settled 2.5 GWh of electricity, a load factor of 7.6%. That volume was settled under EEG support.
Its EEG support runs to the end of 2032, after which that output is sold at market prices.
This asset produced at 7.6% of nameplate in 2024 — the 7th percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE986146812717); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets