Solar farm

Fürstenwalde 2 solar farm

Fürstenwalde 2 solar farm is a solar farm in Germany with a capacity of 1.4 MW, commissioned in 2017. It is operating and is owned by Green Energy 005 GmbH & Co. KG.

In 2024 it settled 1.3 GWh of electricity, a load factor of 10.4%. That volume was settled under EEG support.

Measured performance vs peers
10.4%
This assetCohort median 10.0%Middle half

This asset produced at 10.4% of nameplate in 2024 — the 63rd percentile of German solar commissioned 2015-2019 (635 assets with metered output).

Capacity
1.4 MW
Country
Germany
Status
operating
Commissioned
2017
Owner
Green Energy 005 GmbH & Co. KG
Technology
PV
Measured output 2024
1.3 GWh
Load factor
10.4%
Peer percentile
63rd

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE965668387910); commissioning date and grid connection from EEG-Anlagenstammdaten. All Germany assets