Gardelegen 1 solar farm is a solar farm in Germany with a capacity of 4.8 MW, commissioned in 2022. It is operating and is owned by ENERPARC Solar Invest 123 GmbH.
In 2024 it settled 4.4 GWh of electricity, a load factor of 10.4%. Part of that volume was sold outside EEG support, so it is partly merchant.
Its EEG support runs to the end of 2042, after which that output is sold at market prices.
This asset produced at 10.4% of nameplate in 2024 — the 67th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE970117649396); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets