Solar farm

Groß Behnitz 1 solar farm

Groß Behnitz 1 solar farm is a solar farm in Germany with a capacity of 4.8 MW, commissioned in 2016. It is operating and is owned by mdp GmbH & Co. PV Groß Behnitz KG.

In 2024 it settled 4.4 GWh of electricity, a load factor of 10.5%. That volume was settled under EEG support.

Its EEG support runs to the end of 2036, after which that output is sold at market prices.

Measured performance vs peers
10.5%
This assetCohort median 10.0%Middle half

This asset produced at 10.5% of nameplate in 2024 — the 68th percentile of German solar commissioned 2015-2019 (635 assets with metered output).

Capacity
4.8 MW
Country
Germany
Status
operating
Commissioned
2016
Owner
mdp GmbH & Co. PV Groß Behnitz KG
Technology
PV
Measured output 2024
4.4 GWh
Load factor
10.5%
EEG support ends
2036
Peer percentile
68th
Grid connection
MS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE926030440855); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets