Solar farm

Grotenheid solar farm

Grotenheid solar farm is a solar farm in Germany with a capacity of 9 MW, commissioned in 2019. It is operating and is owned by ENERPARC Solar Invest 23 GmbH.

In 2024 it settled 7.0 GWh of electricity, a load factor of 8.9%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
8.9%
This assetCohort median 10.0%Middle half

This asset produced at 8.9% of nameplate in 2024 — the 20th percentile of German solar commissioned 2015-2019 (635 assets with metered output).

Capacity
9 MW
Country
Germany
Status
operating
Commissioned
2019
Owner
ENERPARC Solar Invest 23 GmbH
Technology
PV
Measured output 2024
7.0 GWh
Load factor
8.9%
Peer percentile
20th
Grid connection
MS
State
Schleswig-Holstein

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE935024462674); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets