Solar farm

Hochstadt Wolfsloch solar farm

Hochstadt Wolfsloch solar farm is a solar farm in Germany with a capacity of 8.6 MW, commissioned in 2019. It is operating.

In 2024 it settled 6.9 GWh of electricity, a load factor of 9.2%. It sold essentially all of that volume outside EEG support — it is already merchant.

Capacity
8.6 MW
Country
Germany
Status
operating
Commissioned
2019
Owner
Technology
PV
Measured output 2024
6.9 GWh
Load factor
9.2%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap