Solar farm

Laubsdorf solar farm

Laubsdorf solar farm is a solar farm in Germany with a capacity of 20 MW, commissioned in 2021. It is operating and is owned by Bejulo GmbH.

In 2024 it settled 17.4 GWh of electricity, a load factor of 9.9%. That volume was settled under EEG support.

Its EEG support runs to the end of 2041, after which that output is sold at market prices.

Measured performance vs peers
9.9%
This assetCohort median 9.7%Middle half

This asset produced at 9.9% of nameplate in 2024 — the 53rd percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
20 MW
Country
Germany
Status
operating
Commissioned
2021
Owner
Bejulo GmbHresearched
Technology
PV
Measured output 2024
17.4 GWh
Load factor
9.9%
EEG support ends
2041
Peer percentile
53rd
Grid connection
HS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against bejulo.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets