Solar farm

NeißeMalxetal (Green Tower) Solarpark

NeißeMalxetal (Green Tower) Solarpark is a solar farm in Germany with a capacity of 5.8 MW, commissioned in 2012. It is operating.

In 2024 it settled 424 MWh of electricity, a load factor of 0.8%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.

Capacity
5.8 MW
Country
Germany
Status
operating
Commissioned
2012
Owner
Technology
PV
Measured output 2024
424 MWh
Load factor
0.8%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap