Solar farm

Pfalzsolar Solarpark XIV (Woldegk) 2(2) solar farm

Pfalzsolar Solarpark XIV (Woldegk) 2(2) solar farm is a solar farm in Germany with a capacity of 5.7 MW, commissioned in 2015. It is operating.

In 2024 it settled 5.6 GWh of electricity, a load factor of 11.2%. That volume was settled under EEG support.

Capacity
5.7 MW
Country
Germany
Status
operating
Commissioned
2015
Owner
Technology
PV
Measured output 2024
5.6 GWh
Load factor
11.2%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap