Solar farm

Photovoltaikpark Gerwisch solar farm

Photovoltaikpark Gerwisch solar farm is a solar farm in Germany with a capacity of 8.6 MW, commissioned in 2009. It is operating and is owned by Ranft Green Energy VI GmbH.

In 2024 it settled 7.5 GWh of electricity, a load factor of 10.0%. That volume was settled under EEG support.

Its EEG support runs to the end of 2029, after which that output is sold at market prices.

Measured performance vs peers
10.0%
This assetCohort median 10.4%Middle half

This asset produced at 10.0% of nameplate in 2024 — the 38th percentile of German solar commissioned pre-2010 (418 assets with metered output).

Capacity
8.6 MW
Country
Germany
Status
operating
Commissioned
2009
Owner
Ranft Green Energy VI GmbH
Technology
PV
Measured output 2024
7.5 GWh
Load factor
10.0%
EEG support ends
2029
Peer percentile
38th
Grid connection
HS/MS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE970315309566); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets