Solar farm

PV Zwiefaltendorf solar farm

PV Zwiefaltendorf solar farm is a solar farm in Germany with a capacity of 5.3 MW, commissioned in 2017. It is operating.

In 2024 it settled 5.0 GWh of electricity, a load factor of 10.8%. That volume was settled under EEG support.

Capacity
5.3 MW
Country
Germany
Status
operating
Commissioned
2017
Owner
Technology
PV
Measured output 2024
5.0 GWh
Load factor
10.8%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap