Solar farm

PVFreiflächenanlage PDGebäude OHR solar farm

PVFreiflächenanlage PDGebäude OHR solar farm is a solar farm in Germany with a capacity of 2.5 MW, commissioned in 2022. It is operating and is owned by August Storck.

In 2024 it settled 22 MWh of electricity, a load factor of 0.1%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
0.1%
This assetCohort median 9.7%Middle half

This asset produced at 0.1% of nameplate in 2024 — the 1st percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
2.5 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
August Storck
Technology
PV
Measured output 2024
22 MWh
Load factor
0.1%
Peer percentile
1st
Grid connection
MS
State
Thüringen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets