Solar farm

PVA 1 Klosterlangheim solar farm

PVA 1 Klosterlangheim solar farm is a solar farm in Germany with a capacity of 5.7 MW, commissioned in 2022. It is operating and is owned by Raiffeisenbank Küps-Mitwitz-Stockheim eG.

In 2024 it settled 5.2 GWh of electricity, a load factor of 10.3%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
10.3%
This assetCohort median 9.7%Middle half

This asset produced at 10.3% of nameplate in 2024 — the 65th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
5.7 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
Raiffeisenbank Küps-Mitwitz-Stockheim eG
Technology
PV
Measured output 2024
5.2 GWh
Load factor
10.3%
Peer percentile
65th
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE981736247009); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets