Solar farm

PVA Ellerdorf ESI 110 solar farm

PVA Ellerdorf ESI 110 solar farm is a solar farm in Germany with a capacity of 9.3 MW, commissioned in 2018. It is operating.

In 2024 it settled 12.2 GWh of electricity, a load factor of 15.0%. It sold essentially all of that volume outside EEG support — it is already merchant.

Capacity
9.3 MW
Country
Germany
Status
operating
Commissioned
2018
Owner
Technology
PV
Measured output 2024
12.2 GWh
Load factor
15.0%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap