PVA Gardelegen solar farm is a solar farm in Germany with a capacity of 1.5 MW, commissioned in 2015. It is operating and is owned by Im Rotbad Beteiligungs GbR Dr. Chr. Peters & Th. Grimm.
In 2024 it settled 1.4 GWh of electricity, a load factor of 10.4%. That volume was settled under EEG support.
Its EEG support runs to the end of 2035, after which that output is sold at market prices.
This asset produced at 10.4% of nameplate in 2024 — the 64th percentile of German solar commissioned 2015-2019 (635 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE945018229985); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets