Solar farm

PVA Gerlebogk BA2 solar farm

PVA Gerlebogk BA2 solar farm is a solar farm in Germany with a capacity of 3 MW, commissioned in 2021. It is operating.

In 2024 it settled 3.1 GWh of electricity, a load factor of 11.7%. Part of that volume was sold outside EEG support, so it is partly merchant.

Capacity
3 MW
Country
Germany
Status
operating
Commissioned
2021
Owner
Technology
PV
Measured output 2024
3.1 GWh
Load factor
11.7%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap