PVA Lauingen II solar farm

PVA Lauingen II solar farm is a solar farm in Germany with a capacity of 4.6 MW, commissioned in 2010. It is operating and is owned by SolEnergi Bayern ApS & Co. PVA Lauingen II KG.

In 2024 it settled 4.5 GWh of electricity, a load factor of 11.2%. That volume was settled under EEG support.

Its EEG support runs to the end of 2030, after which that output is sold at market prices.

Measured performance vs peers
11.2%
This assetCohort median 10.5%Middle half

This asset produced at 11.2% of nameplate in 2024 — the 71st percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
4.6 MW
Country
Germany
Status
operating
Commissioned
2010
Owner
SolEnergi Bayern ApS & Co. PVA Lauingen II KG
Technology
PV
Measured output 2024
4.5 GWh
Load factor
11.2%
EEG support ends
2030
Peer percentile
71st
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE983102253577); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets