Solar farm

PVWS (W4) II solar farm

PVWS (W4) II solar farm is a solar farm in Germany with a capacity of 7.2 MW, commissioned in 2019. It is operating.

In 2024 it settled 7.3 GWh of electricity, a load factor of 11.6%. It sold essentially all of that volume outside EEG support — it is already merchant.

Capacity
7.2 MW
Country
Germany
Status
operating
Commissioned
2019
Owner
Technology
PV
Measured output 2024
7.3 GWh
Load factor
11.6%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap