Riedstadt Leeheim FFA solar farm

Riedstadt Leeheim FFA solar farm is a solar farm in Germany with a capacity of 2 MW, commissioned in 2008. It is operating and is owned by Mainzer Erneuerbare Energien GmbH.

In 2024 it settled 1.6 GWh of electricity, a load factor of 9.3%. That volume was settled under EEG support.

Its EEG support runs to the end of 2028, after which that output is sold at market prices.

Measured performance vs peers
9.3%
This assetCohort median 10.4%Middle half

This asset produced at 9.3% of nameplate in 2024 — the 25th percentile of German solar commissioned pre-2010 (418 assets with metered output).

Capacity
2 MW
Country
Germany
Status
operating
Commissioned
2008
Owner
Mainzer Erneuerbare Energien GmbH
Technology
PV
Measured output 2024
1.6 GWh
Load factor
9.3%
EEG support ends
2028
Peer percentile
25th
Grid connection
MS
State
Hessen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE979449686291); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets