Solar farm

Sabrodt II solar farm

Sabrodt II solar farm is a solar farm in Germany with a capacity of 4.3 MW, commissioned in 2013. It is operating.

In 2024 it settled 2.3 GWh of electricity, a load factor of 6.0%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.

Capacity
4.3 MW
Country
Germany
Status
operating
Commissioned
2013
Owner
Technology
PV
Measured output 2024
2.3 GWh
Load factor
6.0%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap