Solar farm

SIG Wittenberg PW4 solar farm

SIG Wittenberg PW4 solar farm is a solar farm in Germany with a capacity of 7.1 MW, commissioned in 2023. It is operating.

In 2024 it settled 2.5 GWh of electricity, a load factor of 4.0%. It sold essentially all of that volume outside EEG support — it is already merchant. This figure is apportioned across units of the same site that share a registry entry.

Capacity
7.1 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Technology
PV
Measured output 2024
2.5 GWh
Load factor
4.0%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets