Solar farm

So.lie.pa solar farm

So.lie.pa solar farm is a solar farm in Germany with a capacity of 3.3 MW, commissioned in 2013. It is operating.

In 2024 it settled 2.7 GWh of electricity, a load factor of 9.3%. That volume was settled under EEG support.

Capacity
3.3 MW
Country
Germany
Status
operating
Commissioned
2013
Owner
Technology
PV
Measured output 2024
2.7 GWh
Load factor
9.3%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap