Solar farm

Solarpark Asperg Fünfte solar farm

Solarpark Asperg Fünfte solar farm is a solar farm in Germany with a capacity of 9.1 MW, commissioned in 2009. It is operating and is owned by Asperg Fünfte Solar GmbH.

In 2024 it settled 10.2 GWh of electricity, a load factor of 12.8%. That volume was settled under EEG support.

Its EEG support runs to the end of 2029, after which that output is sold at market prices.

Measured performance vs peers
12.8%
This assetCohort median 10.4%Middle half

This asset produced at 12.8% of nameplate in 2024 — the 95th percentile of German solar commissioned pre-2010 (418 assets with metered output).

Capacity
9.1 MW
Country
Germany
Status
operating
Commissioned
2009
Owner
Asperg Fünfte Solar GmbH
Technology
PV
Measured output 2024
10.2 GWh
Load factor
12.8%
EEG support ends
2029
Peer percentile
95th
Grid connection
HS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE973946107204); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets