Solar farm

Solarpark Birkenfeld solar farm

Solarpark Birkenfeld solar farm is a solar farm in Germany with a capacity of 5.8 MW, commissioned in 2019. It is operating and is owned by EnBW Solarpark Birkenfeld GmbH.

In 2024 it settled 4.9 GWh of electricity, a load factor of 9.7%. That volume was settled under EEG support.

Its EEG support runs to the end of 2039, after which that output is sold at market prices.

Measured performance vs peers
9.7%
This assetCohort median 10.0%Middle half

This asset produced at 9.7% of nameplate in 2024 — the 42nd percentile of German solar commissioned 2015-2019 (635 assets with metered output).

Capacity
5.8 MW
Country
Germany
Status
operating
Commissioned
2019
Owner
EnBW Solarpark Birkenfeld GmbH
Technology
PV
Measured output 2024
4.9 GWh
Load factor
9.7%
EEG support ends
2039
Peer percentile
42nd
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE955543226755); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap