Solar farm

Solarpark BonnhofWest solar farm

Solarpark BonnhofWest solar farm is a solar farm in Germany with a capacity of 5.8 MW, commissioned in 2020. It is operating and is owned by Solarpark Bonnhof-West GmbH & Co. KG.

In 2024 it settled 3.7 GWh of electricity, a load factor of 7.2%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
7.2%
This assetCohort median 9.7%Middle half

This asset produced at 7.2% of nameplate in 2024 — the 17th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
5.8 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
Solarpark Bonnhof-West GmbH & Co. KG
Technology
PV
Measured output 2024
3.7 GWh
Load factor
7.2%
Peer percentile
17th
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE906388687768); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets