Solar farm

Solarpark Bornitz BA 2 solar farm

Solarpark Bornitz BA 2 solar farm is a solar farm in Germany with a capacity of 3.8 MW, commissioned in 2020. It is operating and is owned by Energiebauern GmbH & Co. Kraftwerke KG.

In 2024 it settled 3.4 GWh of electricity, a load factor of 10.3%. That volume was settled under EEG support.

Its EEG support runs to the end of 2040, after which that output is sold at market prices.

Measured performance vs peers
10.3%
This assetCohort median 9.7%Middle half

This asset produced at 10.3% of nameplate in 2024 — the 63rd percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
3.8 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
Energiebauern GmbH & Co. Kraftwerke KG
Technology
PV
Measured output 2024
3.4 GWh
Load factor
10.3%
EEG support ends
2040
Peer percentile
63rd
Grid connection
MS
State
Sachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE977949741564); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets