Solar farm

Solarpark Ebrantshausen GmbH Feld E10b solar farm

Solarpark Ebrantshausen GmbH Feld E10b solar farm is a solar farm in Germany with a capacity of 1.3 MW, commissioned in 2017. It is operating and is owned by Solarpark Ebrantshausen GmbH.

In 2024 it settled 920 MWh of electricity, a load factor of 8.1%. That volume was settled under EEG support.

Its EEG support runs to the end of 2037, after which that output is sold at market prices.

Measured performance vs peers
8.1%
This assetCohort median 10.0%Middle half

This asset produced at 8.1% of nameplate in 2024 — the 12th percentile of German solar commissioned 2015-2019 (635 assets with metered output).

Capacity
1.3 MW
Country
Germany
Status
operating
Commissioned
2017
Owner
Solarpark Ebrantshausen GmbH
Technology
PV
Measured output 2024
920 MWh
Load factor
8.1%
EEG support ends
2037
Peer percentile
12th
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE976955068689); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap