Solar farm

Solarpark Eitensheim solar farm

Solarpark Eitensheim solar farm is a solar farm in Germany with a capacity of 4 MW, commissioned in 2024. It is operating.

In 2024 it settled 2.9 GWh of electricity, a load factor of 8.2%. It sold essentially all of that volume outside EEG support — it is already merchant.

Capacity
4 MW
Country
Germany
Status
operating
Commissioned
2024
Owner
Technology
PV
Measured output 2024
2.9 GWh
Load factor
8.2%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap