Solar farm

Solarpark Gardelegen Anlagenteil 2 solar farm

Solarpark Gardelegen Anlagenteil 2 solar farm is a solar farm in Germany with a capacity of 5.8 MW, commissioned in 2018. It is operating and is owned by LHI GII1 PV Garde Halde 2317 GmbH & Co. KG.

In 2024 it settled 4.7 GWh of electricity, a load factor of 9.3%. That volume was settled under EEG support.

Its EEG support runs to the end of 2038, after which that output is sold at market prices.

Measured performance vs peers
9.3%
This assetCohort median 10.0%Middle half

This asset produced at 9.3% of nameplate in 2024 — the 30th percentile of German solar commissioned 2015-2019 (635 assets with metered output).

Capacity
5.8 MW
Country
Germany
Status
operating
Commissioned
2018
Owner
LHI GII1 PV Garde Halde 2317 GmbH & Co. KG
Technology
PV
Measured output 2024
4.7 GWh
Load factor
9.3%
EEG support ends
2038
Peer percentile
30th
Grid connection
MS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE916686576664); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap