Solar farm

Solarpark Höheinöd solar farm

Solarpark Höheinöd solar farm is a solar farm in Germany with a capacity of 2.1 MW, commissioned in 2009. It is operating and is owned by Pfalzwerke Aktiengesellschaft.

In 2024 it settled 135 MWh of electricity, a load factor of 0.7%. That volume was settled under EEG support.

Its EEG support runs to the end of 2029, after which that output is sold at market prices.

Measured performance vs peers
0.7%
This assetCohort median 10.4%Middle half

This asset produced at 0.7% of nameplate in 2024 — the 0th percentile of German solar commissioned pre-2010 (418 assets with metered output).

Capacity
2.1 MW
Country
Germany
Status
operating
Commissioned
2009
Owner
Pfalzwerke Aktiengesellschaft
Technology
PV
Measured output 2024
135 MWh
Load factor
0.7%
EEG support ends
2029
Peer percentile
0th
Grid connection
MS
State
Rheinland-Pfalz

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE999952467552); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap