Solar farm

Solarpark Kreina BA 2 solar farm

Solarpark Kreina BA 2 solar farm is a solar farm in Germany with a capacity of 9.3 MW, commissioned in 2020. It is operating and is owned by Energiebauern GmbH & Co. Kraftwerke KG.

In 2024 it settled 8.5 GWh of electricity, a load factor of 10.4%. That volume was settled under EEG support.

Measured performance vs peers
10.4%
This assetCohort median 9.7%Middle half

This asset produced at 10.4% of nameplate in 2024 — the 67th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
9.3 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
Energiebauern GmbH & Co. Kraftwerke KG
Technology
PV
Measured output 2024
8.5 GWh
Load factor
10.4%
Peer percentile
67th

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE906808374933); commissioning date and grid connection from EEG-Anlagenstammdaten. All Germany assets