Solarpark Krempendorf III (Bassenheim) solar farm is a solar farm in Germany with a capacity of 4.4 MW, commissioned in 2017. It is operating and is owned by FP Lux Solar GmbH & Co. Krempendorf KG.
In 2024 it settled 3.7 GWh of electricity, a load factor of 9.5%. That volume was settled under EEG support.
Its EEG support runs to the end of 2037, after which that output is sold at market prices.
This asset produced at 9.5% of nameplate in 2024 — the 36th percentile of German solar commissioned 2015-2019 (635 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE992493147907); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets