Solar farm

Solarpark Rottenbach 2 Teilanlage solar farm

Solarpark Rottenbach 2 Teilanlage solar farm is a solar farm in Germany with a capacity of 2.5 MW, commissioned in 2020. It is operating.

In 2024 it settled 2.5 GWh of electricity, a load factor of 11.6%. It sold essentially all of that volume outside EEG support — it is already merchant.

Capacity
2.5 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
Technology
PV
Measured output 2024
2.5 GWh
Load factor
11.6%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets