Solar farm

SonnenenergiePark 2 GmbH solar farm

SonnenenergiePark 2 GmbH solar farm is a solar farm in Germany with a capacity of 3.8 MW, commissioned in 2013. It is operating and is owned by Sonnenenergie-Park 2 GmbH.

In 2024 it settled 3.5 GWh of electricity, a load factor of 10.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2033, after which that output is sold at market prices.

Measured performance vs peers
10.6%
This assetCohort median 10.5%Middle half

This asset produced at 10.6% of nameplate in 2024 — the 54th percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
3.8 MW
Country
Germany
Status
operating
Commissioned
2013
Owner
Sonnenenergie-Park 2 GmbH
Technology
PV
Measured output 2024
3.5 GWh
Load factor
10.6%
EEG support ends
2033
Peer percentile
54th
Grid connection
MS
State
Thüringen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE926466596607); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets