Solar farm

Solarkraftwerk Gnodstadt solar farm

Solarkraftwerk Gnodstadt solar farm is a solar farm in Germany with a capacity of 1.6 MW, commissioned in 2007. It is operating and is owned by Holding für Versorgung und Verkehr GmbH Bochum.

In 2024 it settled 1.1 GWh of electricity, a load factor of 8.1%. That volume was settled under EEG support.

Its EEG support runs to the end of 2027, after which that output is sold at market prices.

Measured performance vs peers
8.1%
This assetCohort median 10.4%Middle half

This asset produced at 8.1% of nameplate in 2024 — the 10th percentile of German solar commissioned pre-2010 (418 assets with metered output).

Capacity
1.6 MW
Country
Germany
Status
operating
Commissioned
2007
Owner
Holding für Versorgung und Verkehr GmbH Bochum
Technology
PV
Measured output 2024
1.1 GWh
Load factor
8.1%
EEG support ends
2027
Peer percentile
10th
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE993111822138); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets