Solar farm

VW WOB H55 solar farm

VW WOB H55 solar farm is a solar farm in Germany with a capacity of 1.1 MW, commissioned in 2008. It is operating and is owned by WG Projektmanagement Inh. Wolfgang Gehrlicher e. K..

In 2024 it settled 893 MWh of electricity, a load factor of 9.3%. That volume was settled under EEG support.

Its EEG support runs to the end of 2028, after which that output is sold at market prices.

Measured performance vs peers
9.3%
This assetCohort median 10.4%Middle half

This asset produced at 9.3% of nameplate in 2024 — the 24th percentile of German solar commissioned pre-2010 (418 assets with metered output).

Capacity
1.1 MW
Country
Germany
Status
operating
Commissioned
2008
Owner
WG Projektmanagement Inh. Wolfgang Gehrlicher e. K.
Technology
PV
Measured output 2024
893 MWh
Load factor
9.3%
EEG support ends
2028
Peer percentile
24th
Grid connection
HS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap