Solar farm

Westertimke 1.1 solar farm

Westertimke 1.1 solar farm is a solar farm in Germany with a capacity of 6.6 MW, commissioned in 2021. It is operating and is owned by ENERPARC Solar Invest 255 TU 14 GmbH.

In 2024 it settled 4.8 GWh of electricity, a load factor of 8.4%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
8.4%
This assetCohort median 9.7%Middle half

This asset produced at 8.4% of nameplate in 2024 — the 29th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
6.6 MW
Country
Germany
Status
operating
Commissioned
2021
Owner
ENERPARC Solar Invest 255 TU 14 GmbH
Technology
PV
Measured output 2024
4.8 GWh
Load factor
8.4%
Peer percentile
29th
Grid connection
MS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE994579733684); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets