Wind farm

Jeßnitz wind farm

Jeßnitz wind farm is a wind farm in Germany with a capacity of 10 MW, commissioned in 2006. It is operating and is owned by WSB Windpark Jeßnitz GmbH & Co. KG.

In 2024 it settled 14.7 GWh of electricity, a load factor of 16.7%. That volume was settled under EEG support.

Its EEG support ran to the end of 2025.

Measured performance vs peers
16.7%
This assetCohort median 16.3%Middle half

This asset produced at 16.7% of nameplate in 2024 — the 51st percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
10 MW
Country
Germany
Status
operating
Commissioned
2006
Owner
WSB Windpark Jeßnitz GmbH & Co. KG
Technology
Onshore
Measured output 2024
14.7 GWh
Load factor
16.7%
EEG support ends
2025
Peer percentile
51st
Grid connection
HS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE962933482875); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets