Wind farm

Oberkochen wind farm

Oberkochen wind farm is a wind farm in Germany with a capacity of 10 MW, commissioned in 2015. It is operating and is owned by Windpark Oberkochen GmbH & Co. KG.

In 2024 it settled 25.5 GWh of electricity, a load factor of 29.1%. That volume was settled under EEG support.

Its EEG support runs to the end of 2035, after which that output is sold at market prices.

Measured performance vs peers
29.1%
This assetCohort median 24.7%Middle half

This asset produced at 29.1% of nameplate in 2024 — the 80th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
10 MW
Country
Germany
Status
operating
Commissioned
2015
Owner
Windpark Oberkochen GmbH & Co. KG
Technology
Onshore
Measured output 2024
25.5 GWh
Load factor
29.1%
EEG support ends
2035
Peer percentile
80th
Grid connection
MS
State
Baden-Württemberg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE989191308082); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets