Ringstedt II wind farm is a wind farm in Germany with a capacity of 10 MW, commissioned in 2007. It is operating and is owned by HT Aiwanger GmbH & Co KG.
In 2024 it settled 6.9 GWh of electricity, a load factor of 7.9%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.
Its EEG support runs to the end of 2033, after which that output is sold at market prices.
This asset produced at 7.9% of nameplate in 2024 — the 5th percentile of German wind commissioned pre-2010 (182 assets with metered output). Its volume is apportioned across phases sharing one registry entry, so treat the figure as an estimate for this unit and exact for the site.
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against futurenetzero.com; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets