Wind farm

Finkenbach-Gersweiler wind farm

Finkenbach-Gersweiler wind farm is a wind farm in Germany with a capacity of 12 MW, commissioned in 2017. It is operating and is owned by Windpark Finkenbach-Gersweiler GmbH & Co.KG.

In 2024 it settled 28.0 GWh of electricity, a load factor of 26.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2037, after which that output is sold at market prices.

Measured performance vs peers
26.6%
This assetCohort median 24.7%Middle half

This asset produced at 26.6% of nameplate in 2024 — the 65th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
12 MW
Country
Germany
Status
operating
Commissioned
2017
Owner
Windpark Finkenbach-Gersweiler GmbH & Co.KG
Technology
Onshore
Measured output 2024
28.0 GWh
Load factor
26.6%
EEG support ends
2037
Peer percentile
65th
Grid connection
HS
State
Rheinland-Pfalz

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE952538477284); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets