Gölenkamp-Wilsum wind farm is a wind farm in Germany with a capacity of 12 MW, commissioned in 2011. It is operating.
In 2024 it settled 7.2 GWh of electricity, a load factor of 6.8%. It sold essentially all of that volume outside EEG support — it is already merchant. This figure is apportioned across units of the same site that share a registry entry.
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets