Wind farm

Kuhbett wind farm

Kuhbett wind farm is a wind farm in Germany with a capacity of 12 MW, commissioned in 2018. It is operating and is owned by CEE Windpark Kuhbett GmbH & Co. KG.

In 2024 it settled 34.5 GWh of electricity, a load factor of 32.8%. That volume was settled under EEG support.

Its EEG support runs to the end of 2037, with later phases to 2038, after which that output is sold at market prices.

Measured performance vs peers
32.8%
This assetCohort median 24.7%Middle half

This asset produced at 32.8% of nameplate in 2024 — the 95th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
12 MW
Country
Germany
Status
operating
Commissioned
2018
Owner
CEE Windpark Kuhbett GmbH & Co. KG
Technology
Onshore
Measured output 2024
34.5 GWh
Load factor
32.8%
EEG support ends
2037
Peer percentile
95th
Grid connection
MS
State
Hessen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE958141631075); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets