Leissberg Windpark is a wind farm in Germany with a capacity of 12 MW, commissioned in 2013. It is operating and is owned by Windpark Oberthal GmbH.
In 2024 it settled 23.0 GWh of electricity, a load factor of 21.9%. That volume was settled under EEG support.
Its EEG support runs to the end of 2033, with later phases to 2034, after which that output is sold at market prices.
This asset produced at 21.9% of nameplate in 2024 — the 49th percentile of German wind commissioned 2010-2014 (128 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE944281087438); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets